Project Description
Concrete Frames, Basements & Groundworks
Client: L&Q
Contract Value: >£16.0m
Contract Duration: >24 months
Greater London development to offer apartment living in a popular and upcoming suburb, with works including Substructure Foundations, Basement & multiple Reinforced Concrete Frames.
Challenges Tamdown have worked with the client to overcome on site have included:
- Keeping the access road clear at all times, the access road runs directly passed the site entrance making the off load of materials difficult – we worked with L&Q to find solutions and ensured disciplined management of material deliveries to minimise disruption to both the site and the local community.
- A redesign which included a significant number of level changes in the floor slabs and deep pile caps all within a confined working area – Tamdown re-programmed & re-sequenced the project to suit the new design and our customers developing needs.